Wednesday, 26 August 2009

FW: Before the operation

 

 

Before I am to be immobilised by the new knee operation there were one or two things which needed to be done.

One was a visit to my daughter, son in law and the grandchildren in Kent. So I caught the train down and we had a lovely day on Camber Sands, a place I had not been to since my own children we in their early years. It hasn’t changed much, apart from a large wind farm which as doing good business due to the very strong on shore breeze and the weather was super so we played silly games, paddles and enjoyed a picnic of sandwiches and sand. The day was rounded off with a trip to the pub and a fish and chip supper, so a good time was had by all.

 

 

 

 

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home